Client: Rasmussen & Associates
- A 13,000 square foot new church building integrated into a multi-building development on campus
- Radiant floor heating with a displacement ventilation system supplying ventilation to the space
- HVAC controls specified as a BacNet open protocol system allowing for integration of this building with an anticipated future campus-wide network
- Plumbing design included coordination of gas loads with the propane system purveyor
- Sewage lift station design for waste from the 6,000 square foot basement