Drum Workshop Manufacturing Facility, Oxnard, CA

Client: Johnson + Muller Architects

  • 45,000 square foot high end drum manufacturing plant
  • Ventilation and heating for manufacturing area
  • Dust collection system for woodworking area
  • HVAC and plumbing design for 8,400 square foot office area

Astro-Cosmos Manufacturing Facility, Camarillo, CA

Client: Johnson + Muller Architects

  • General ventilation to serve a 63,000 square foot manufacturing facility
  • Process ventilation over specific equipment
  • HVAC and plumbing design for 7,300 square foot office area
  • Piping design including argon, compressed air, and process cooling water for welding stations
  • Drainage for water testing tank pressure vessel