Silagi Office Building, Ventura, CA


Client: Johnson + Muller Architects

  • A two story, steel framed 33,000 square foot office building
  • Single packaged heat pumps for each designated tenant space with additional units serving lobby and corridor areas
  • Plumbing design for core restrooms at each floor, wet columns to allow future plumbing for the tenant spaces
  • Recirculating domestic hot water loop for each floor

Oxnard Civic Center, Oxnard, CA

Client: JSA Architecture & Planning

  • A 28,000 square foot, four story office building serving the City of Oxnard
  • Existing constant volume dual duct HVAC system replaced with a dual duct VAV system consisting of a custom dual-deck air handler, 100-ton dx condenser and low NOx modulating boiler
  • Complete first floor renovation with controls converted to DDC
  • System designed to “grow” into the rest of the building as additional floors were renovated

Thomas Aquinas College Administration Building Santa Paula, CA

Client: Rasmussen & Associates

  • A three story 24,000 square foot office building serving the private college
  • Mechanical equipment selection based on an E-Quest energy model generated in-house
  • Careful coordination between the architect, structural engineer, and our office minimized conflicts with the ornate building interior and achieved the desired interior aesthetic