<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Nibecker &#38; Associates &#187; Religious Worship</title>
	<atom:link href="http://nibecker.com/category/projects/religious-worship/feed/" rel="self" type="application/rss+xml" />
	<link>http://nibecker.com</link>
	<description>Consulting Mechanical Engineers</description>
	<lastBuildDate>Sat, 25 Aug 2012 00:28:28 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.4.1</generator>
		<item>
		<title>Thomas Aquinas College Our Lady of the Most Blessed Trinity, Santa Paula, CA</title>
		<link>http://nibecker.com/thomas-aquinas-college-our-lady-of-the-most-blessed-trinity-santa-paula-ca/</link>
		<comments>http://nibecker.com/thomas-aquinas-college-our-lady-of-the-most-blessed-trinity-santa-paula-ca/#comments</comments>
		<pubDate>Wed, 18 Jul 2012 18:55:50 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Religious Worship]]></category>

		<guid isPermaLink="false">http://174.120.254.130/~nibecker/?p=245</guid>
		<description><![CDATA[Client: Rasmussen &#38; Associates A 13,000 square foot new church building integrated into a multi-building development on campus Radiant floor heating with a displacement ventilation system supplying ventilation to the space HVAC controls specified as a BacNet open protocol system allowing for integration of this building with an anticipated future campus-wide network Plumbing design included [...]]]></description>
			<content:encoded><![CDATA[<p><img class="size-full wp-image-246 alignnone" title="religi6" src="http://174.120.254.130/~nibecker/wp-content/uploads/2012/07/religi6.jpg" alt="" width="584" height="204" /><a href="http://174.120.254.130/~nibecker/wp-content/uploads/2012/07/religi18.gif"><img class="alignright size-medium wp-image-247" title="religi18" src="http://174.120.254.130/~nibecker/wp-content/uploads/2012/07/religi18-300x227.gif" alt="" width="300" height="227" /></a></p>
<p>Client: Rasmussen &amp; Associates</p>
<ul>
<li>A 13,000 square foot new church building integrated into a multi-building development on campus</li>
<li>Radiant floor heating with a displacement ventilation system supplying ventilation to the space</li>
<li>HVAC controls specified as a BacNet open protocol system allowing for integration of this building with an anticipated future campus-wide network</li>
<li>Plumbing design included coordination of gas loads with the propane system purveyor</li>
<li>Sewage lift station design for waste from the 6,000 square foot basement</li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://nibecker.com/thomas-aquinas-college-our-lady-of-the-most-blessed-trinity-santa-paula-ca/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ventura Baptist Church, Ventura, CA</title>
		<link>http://nibecker.com/ventura-baptist-church-ventura-ca/</link>
		<comments>http://nibecker.com/ventura-baptist-church-ventura-ca/#comments</comments>
		<pubDate>Wed, 18 Jul 2012 18:52:10 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Religious Worship]]></category>

		<guid isPermaLink="false">http://174.120.254.130/~nibecker/?p=239</guid>
		<description><![CDATA[Client: Rasmussen &#38; Associates A new 14,000 square foot sanctuary building added onto the end of an existing building Acoustical treatments designated by an acoustical consultant and implemented by our office HVAC system loads coordinated with project stage lighting Air distribution designed to provide separate seating and stage zones]]></description>
			<content:encoded><![CDATA[<p><img class="alignnone size-full wp-image-240" title="VenturaBaptist1" src="http://174.120.254.130/~nibecker/wp-content/uploads/2012/07/VenturaBaptist1.jpg" alt="" width="583" height="253" /><br />
<img class="alignleft size-full wp-image-243" title="VenturaBaptist2" src="http://174.120.254.130/~nibecker/wp-content/uploads/2012/07/VenturaBaptist2.jpg" alt="" width="320" height="181" />Client: Rasmussen &amp; Associates</p>
<ul>
<li>A new 14,000 square foot sanctuary building added onto the end of an existing building</li>
<li>Acoustical treatments designated by an acoustical consultant and implemented by our office</li>
<li>HVAC system loads coordinated with project stage lighting</li>
<li>Air distribution designed to provide separate seating and stage zones</li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://nibecker.com/ventura-baptist-church-ventura-ca/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Moorpark Presbyterian Church, Moorpark, CA</title>
		<link>http://nibecker.com/moorpark-presbyterian-church-moorpark-ca/</link>
		<comments>http://nibecker.com/moorpark-presbyterian-church-moorpark-ca/#comments</comments>
		<pubDate>Wed, 18 Jul 2012 18:49:01 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Religious Worship]]></category>

		<guid isPermaLink="false">http://174.120.254.130/~nibecker/?p=232</guid>
		<description><![CDATA[Client: DLV Design and Construction An 11,000 square foot sanctuary with an 11,000 square foot basement for office space, youth and choir rooms HVAC loads carefully coordinated with expected occupancy loads and lighting requirements Plumbing design consisting of roof drainage, recirculating domestic hot water, plumbing fixtures and associated piping, and natural gas and condensate piping [...]]]></description>
			<content:encoded><![CDATA[<p><img class="alignleft size-full wp-image-233" title="religi16" src="http://174.120.254.130/~nibecker/wp-content/uploads/2012/07/religi16.jpg" alt="" width="352" height="264" /></p>
<p>Client: DLV Design and Construction</p>
<ul>
<li>An 11,000 square foot sanctuary with an 11,000 square foot basement for office space, youth and choir rooms</li>
<li>HVAC loads carefully coordinated with expected occupancy loads and lighting requirements</li>
<li>Plumbing design consisting of roof drainage, recirculating domestic hot water, plumbing fixtures and associated piping, and natural gas and condensate piping to serve HVAC equipment</li>
</ul>
<p><img class="alignnone size-full wp-image-234" title="religi17" src="http://174.120.254.130/~nibecker/wp-content/uploads/2012/07/religi17.gif" alt="" width="588" height="387" /></p>
]]></content:encoded>
			<wfw:commentRss>http://nibecker.com/moorpark-presbyterian-church-moorpark-ca/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
